Nova
Originated From France
Request a Quote

Home/Resources/Importing & Compliance/Thermostatic Mixing Valves: TMV2 vs TMV3

Importing & Compliance · explainer

Thermostatic Mixing Valves on a Tender: TMV2 vs TMV3, EN 1111 and the Failure Mode Nobody Tests For

What TMV2 and TMV3 each prove, which EN 1111 and EN 1287 edition to cite, the 2021 audit failure at low flow, and the blended pipe run no valve approval covers.

Two numbers decide most thermostatic mixing valve tenders: 48 °C and 41 °C. A thermostatic mixing valve (TMV) blends hot and cold water to a set temperature and shuts the flow down if one supply fails. In England, requirement G3(4) caps the water delivered to a bath in a new dwelling at 48 °C, and TMV2 is the UK approval scheme for domestic valves that meet BS EN 1111 and/or BS EN 1287. TMV3 is the healthcare scheme: valves that meet NHS specification D 08, with 41 °C at showers and washbasins and 44 °C at baths. On a hospital job the two are not interchangeable.

Both approvals describe a valve on a test rig, not the valve after months in your building or the blended pipe run after it. Below: the two schemes, the standard editions to cite, a 2021 audit failure, and the tender checks.

Key takeaways

  • TMV2 covers domestic valves that meet BS EN 1111:2017 (high pressure) and/or BS EN 1287:2017 (low pressure). TMV3 covers healthcare valves that meet NHS specification D 08 (2017 edition).
  • D 08 maximum mixed water temperatures: 41 °C at showers and washbasins, 44 °C at baths (46 °C for assisted baths), 38 °C at bidets.
  • EN 1111 and EN 1287 were both revised in 2026; ask which edition a certificate cites.
  • In February 2021 NHS Scotland warned that a TMV3-marked valve reached 45.4 °C in a healthcare audit when hot pressure exceeded cold, although it satisfied BS EN 1111 and BS EN 1287.
  • No valve approval covers the blended pipe after the valve. Approved Document G asks for that run to be kept to a minimum.
  • IFANNova does not make or certify TMVs. We supply the pipe and the brass isolation and check valves around them.
A short video of a TMV water fail-safe test: the check that a valve shuts the outlet down when one supply is lost. The in-service test further down, D 08 clause 11.2, puts a number on it.
TMV - Thermostatic mixing valve (water fail safe test)


Video: Sandip Shrestha, YouTube. If the player does not load, watch it on YouTube.

TMV2 vs TMV3: which scheme fits which building

TMV2 and TMV3 are UK third-party approval schemes, not standards. Both began under BuildCert; the TMV2 Scheme and TMV3 Scheme logos are now registered marks of NSF Wales Limited. According to BEAMA, TMV2 confirms that a domestic valve meets either or both BS EN 1111 and BS EN 1287. TMV3 confirms compliance with D 08, the NHS performance specification published as a supplement to Health Technical Memorandum 04-01.

The domestic legal hook is narrow. Requirement G3(4) applies when a dwelling is erected or formed by a material change of use, and limits water delivered to a fixed bath to 48 °C. Approved Document G (2015 edition with 2024 amendments), paragraph 3.66, still names BS EN 1111:1999 and BS EN 1287:1999 as ways to show the valve will fail safe. It does not name TMV2. For care settings, HSE guidance points to a TMV Type 3 so that water discharged to vulnerable users does not exceed 44 °C.

TMV2 vs TMV3 on a tender: what each approval tests, and where it belongs.
Scheme Tested to Best for Max outlet temperature (°C) In-service check
TMV2 BS EN 1111:2017 and/or BS EN 1287:2017 Dwellings; baths under requirement G3(4) 48 at a bath (G3(4), England) Once a year
TMV3 NHS D 08, 2017 edition High-risk areas of healthcare premises 41 shower and basin; 44 bath; 46 assisted bath; 38 bidet At 6 to 8 weeks, then 12 to 15 weeks

Source: NSF, TMV2 and TMV3 certification; HTM 04-01 Supplement, D 08 (2017), Table 2; Approved Document G, requirement G3(4); BEAMA TMV FAQ for in-service intervals. Compiled 25 September 2026.

D 08 expects isolating valves on each TMV so it can be tested in place, and the check valves its maker specifies. For contractors building that package around TMV2 or TMV3 valves, our brass ball, gate and check valves run from 1/2″ to 4″. They are isolation and non-return parts, not TMVs, and carry no TMV2 or TMV3 approval.

Wall-mounted pipework test board with green PP-R pipe, a red steel riser, an inline brass check valve, brass isolation valves and a water meter on a navy steel frame
Isolating valves on each supply and a check valve where the maker specifies one are what let a TMV be tested in place. This test board shows those ordinary brass parts on PP-R pipe; they sit outside the valve’s TMV2 or TMV3 approval.

EN 1111 and EN 1287: which edition the certificate should cite

EN 1111 covers PN 10 thermostatic mixing valves for high-pressure supplies; EN 1287 covers low-pressure valves. Both are domestic standards: their 2026 scope covers valves serving one or a few outlets in kitchens, washrooms and bathrooms, and excludes institutional systems with large numbers of outlets. They test mixed water below 45 °C and recommend about 38 °C where the valve gives anti-scald protection.

Both were revised this year. Estonia’s national standards body lists EVS-EN 1111:2026 as current from 1 April 2026 and EVS-EN 1287:2026 from 15 April 2026, each replacing the 2017 edition, and BS EN 1111:2026 appears on BSI’s development list. NSF’s TMV2 page still names BS EN 1111:2017 and BS EN 1287:2017. A 2017-edition TMV2 certificate is therefore normal today, not lapsed. A tender that says only “to EN 1111” leaves the edition open: state the edition you accept, or accept either and record which arrived.

D 08 builds on EN 1111 and EN 1287. Its clauses 5.1 and 6.1.1 accept their certification as proof of leaktightness and on/off durability; the thermal tests are D 08’s own, run inside the envelope below.

D 08 operating conditions: if your measured supply sits outside these, the approval test does not describe your installation.
Parameter High pressure (HP) Low pressure (LP)
Maximum static pressure (bar) 10 10
Flow pressure, hot and cold (bar) 1 to 5 0.2 to 1
Hot supply temperature (°C) 55 to 65 55 to 65
Cold supply temperature (°C) 5 to 20 5 to 20

Source: HTM 04-01 Supplement, performance specification D 08 (2017 edition), Table 1. Compiled 25 September 2026.

Measure hot and cold flow pressures at the outlet before choosing an HP or LP designation.

The failure mode: an approved valve that overshoots at low flow

The case that shows the gap is on record. On 4 February 2021 NHS Scotland issued Safety Action Notice SAN(SC)21/04 on RWC TMV3 Easifit 15 mm T-type valves. In audits to HTM 04-01, the valve failed two D 08 tests: 7.10, temperature stability with changing supply pressure, and 7.12, temperature stability at reduced flow rate. Retested after a 48-hour thermal-endurance conditioning run, it failed the same two tests again in the same way. With hot pressure above cold, mixed water reached 45.4 °C, 3.4 °C over the shower limit.

SAN(SC)21/04: audited mixed water temperature vs the D 08 shower maximum (°C)0102030405041D 08 showerlimit45.4Audited valve,hot above coldD 08 shower maximum (°C)SAN(SC)21/04 audit (°C)
With hot pressure above cold, the audited valve delivered 45.4 °C, 3.4 °C over the 41 °C shower maximum. It failed D 08 tests 7.10 and 7.12 in audit and failed them again after a 48-hour thermal-endurance conditioning run, although it satisfied BS EN 1111 and BS EN 1287. Method: NHS Scotland Safety Action Notice SAN(SC)21/04 (4 February 2021); D 08 (2017) Table 2, read 25 September 2026.
SAN(SC)21/04: audited mixed water temperature vs the D 08 shower maximum (°C). Source and method: NHS Scotland Safety Action Notice SAN(SC)21/04 (4 February 2021); D 08 (2017) Table 2, read 25 September 2026.
Reading D 08 shower maximum (°C) SAN(SC)21/04 audit (°C)
D 08 shower limit 41 —
Audited valve, hot above cold — 45.4

The same notice records that the valve satisfied BS EN 1111 and BS EN 1287, the domestic standards. Health boards had until 12 April 2021 to find the valves and risk-assess them through their Water Safety Group.

What clause 7.12 asks

Cold pressure drops to 80 to 85% of its set value, then flow drops to 4 L/min for a shower, basin or bidet, or 10 L/min for a bath fill. The average mixed temperature may move by no more than 2 K. A basin run gently on an unbalanced supply meets that condition in normal use, and domestic approval alone did not answer it.

For healthcare, ask for the D 08 designation that matches each outlet, such as HP-W for a basin or HP-T44 for a bath. A TMV3 mark belongs to one valve reference: NSF’s rules require the valve’s unique reference number and the licence holder’s name beside the logo, next to the exact approved valve. A substitute needs its own certificate.

What no valve approval covers: the pipe after the valve

Every test above measures the valve; none measures the pipe between valve and tap. Under D 08 the water in that run is set between 38 and 46 °C. HSE gives 20 to 45 °C as the range suitable for Legionella growth, and asks for hot water stored at 60 °C or above and distributed so that it reaches 50 °C (55 °C in healthcare premises) within one minute at outlets.

Blended-water outlet limits vs the HSE Legionella growth range (°C)0122436486038Bidet41Shower41Washbasin44Bath (T44)46Assisted bath(T46)48New-dwellingbathD 08 maximum (°C)G3(4) bath cap (°C)HSE growth range (20 to 45 °C)
Every D 08 outlet maximum from 38 to 44 °C sits inside the 20 to 45 °C range HSE gives as suitable for Legionella growth; only the 46 °C assisted-bath setting and the 48 °C G3(4) bath cap sit just above it. The blended run after a TMV holds water at these settings. Method: D 08 (2017) Table 2 maximum mixed water temperatures; Approved Document G requirement G3(4) (2015 edition with 2024 amendments); HSE Legionella guidance (what-is page), read 25 September 2026.
Blended-water outlet limits vs the HSE Legionella growth range (°C). Source and method: D 08 (2017) Table 2 maximum mixed water temperatures; Approved Document G requirement G3(4) (2015 edition with 2024 amendments); HSE Legionella guidance (what-is page), read 25 September 2026.
Outlet D 08 maximum (°C) G3(4) bath cap (°C) HSE growth range (°C)
Bidet 38 — —
Shower 41 — —
Washbasin 41 — —
Bath (T44) 44 — —
Assisted bath (T46) 46 — —
New-dwelling bath — 48 —
Growth range, lower edge — — 20
Growth range, upper edge — — 45

The guidance answers with length, not with a test. Approved Document G paragraph 3.68 asks for supply pipes between in-line blending valves and outlets to be kept to a minimum “in order to prevent the colonisation of waterborne pathogens”. HSE asks for TMVs to be fitted as close as possible to outlets where a scald risk is identified, and for infrequently used outlets to be flushed at least weekly. Neither sets a length in metres, and we found no authority that does.

That makes the blended run a drawing decision: put the valve at the outlet rather than in a cupboard feeding several rooms, and list blended pipe length per outlet on the schedule. The hot and cold feeds are a separate choice, covered in our note on CPVC vs PP-R for hot water. IFANNova’s PP-R pipe and fittings are PN20 in 20, 25 and 32 mm.

What to write into the tender, and the test that proves it

  • Scheme and designation per outlet: TMV2 for dwellings, TMV3 with a D 08 designation for healthcare.
  • Certificate: valve reference, licence holder, and the EN 1111 or EN 1287 edition it cites.
  • Measured supply: hot and cold flow pressures and temperatures, checked against the D 08 bands.
  • Blended pipe length from each valve to its outlet.
  • Isolating valves, strainers and check valves as the maker specifies, so each valve can be tested in place.

Then the proof. D 08 clause 11.2 sets the in-service test: record the mixed temperature at full flow, isolate the cold supply, and after 5 seconds collect what runs for 60 seconds. More than 120 mL means the valve needs recommissioning. Restore the cold supply, and the temperature should come back within 2 °C of the first reading. BEAMA gives the intervals: once a year for TMV2 valves, and for TMV3 a first test 6 to 8 weeks after commissioning and a second at 12 to 15 weeks.

Gloved hand closing the brass isolation valve on the cold inlet of a chrome thermostatic mixing valve beneath a basin, with a clear measuring jug under the outlet
The clause 11.2 check needs nothing more than an isolating valve and a jug: shut the cold supply, wait 5 seconds, collect for 60 seconds. More than 120 mL means recommissioning. (Illustration.)

Lead time: the approval first, then the pipe

We publish no TMV lead time because we do not make TMVs. The first date that matters is when the exact certified valve reference is confirmed, since a substitute needs its own certificate and restarts the submittal. For the pipe and brass parts around the valves, ask us for the plant-departure date against that confirmed schedule; we hold no standing figure to print.

Where we stop: what we supply and what we do not

IFANNova is a French-designed, European-standard piping brand supplying PP-R, PEX, HDPE and UPVC/CPVC systems, 2405 brass fittings from 1/4″ to 1″, and brass valves from 1/2″ to 4″. We make no thermostatic mixing valves and hold no TMV2 or TMV3 approval.

Conclusion

The choice trades cost and paperwork against margin. TMV2 gives a valve proven to EN 1111 or EN 1287 at domestic conditions and a 48 °C bath limit. TMV3 adds D 08’s thermal tests, the 41 °C and 44 °C limits and a tighter in-service regime, which a ward needs and a flat usually does not. The 2021 Scottish notice shows a domestic pass does not predict healthcare behaviour at low flow, and neither scheme covers the blended run.

Written by the IFANNova Technical Team (Engineering & Export), from Approved Document G, NHS D 08, the NHS Scotland notice, HSE guidance and the scheme documents cited above.

Reviewed 25 September 2026. IFANNova makes no TMVs and holds no TMV2 or TMV3 approval; no lead-time figure is stated because none is held.

Frequently Asked Questions

What is the difference between TMV2 and TMV3?

TMV2 approves domestic valves that meet BS EN 1111 and/or BS EN 1287. TMV3 approves valves for healthcare premises that meet NHS specification D 08, with maximum mixed water temperatures of 41 °C at showers and washbasins and 44 °C at baths.

Is EN 1111 the same as TMV2?

No. EN 1111 is the European standard for PN 10 thermostatic mixing valves; TMV2 is a UK approval scheme that confirms a valve meets BS EN 1111 and/or BS EN 1287. EN 1111 was revised in 2026, and NSF’s TMV2 page still names the 2017 editions.

How often should a TMV be tested?

BEAMA gives once a year for TMV2 valves. For TMV3, the first in-service test comes 6 to 8 weeks after commissioning and the second at 12 to 15 weeks. D 08 clause 11.2 sets the method, with a 120 mL limit on water collected after the cold supply is isolated.

What temperature should a TMV be set to?

For a bath in a new dwelling in England, no more than 48 °C under requirement G3(4). Under D 08: 41 °C at showers and washbasins, 44 °C at baths (46 °C for assisted baths) and 38 °C at bidets.