Can a Master Valve and Pump Relay Share One P/MV Output?

Do not connect a master-valve solenoid and pump-start relay to one P/MV output merely because both are labelled for the same voltage. The exact controller must permit the proposed combination, and its output and total loading requirements must be satisfied. If the manufacturer documents only a single device or the combined arrangement is unconfirmed, keep the proposal on hold for that manufacturer’s review.

The P/MV connection is a control output. It does not supply the pump motor. A relay separates the controller’s low-voltage command from the pump’s power circuit; electrical installation, isolation and any redesign belong with a qualified installer using the actual equipment documentation.

Key takeaways

MECÁNICA DE COMUNICACIÓN — Válvula Maestra (MV) y PSR el relé de arranque de Bomba de HUNTER. Spanish-language background on master valves and pump-start relays. This video does not authorise connecting both loads to one controller output. Open on YouTube.

What the P/MV label actually establishes

A normally closed master valve controls water entering the irrigation main. A pump-start relay controls a separate pump power circuit. Either may respond to a watering command, which explains why controllers can label an output for both functions. It does not follow that every such output may operate both devices together.

The Hunter Hydrawise P/MV support page describes a single master-valve solenoid and a relay holding-current limit of 0.28 A for the connection it describes. It also directs readers to the hardware support section for wiring. That wording is not a blanket two-device approval for all Hunter controllers.

A controller’s app settings can enable a pump/master-valve command for a zone. Enabling that command does not increase the electrical output capacity or change the load that a connected device draws. Keep the programming decision separate from the hardware compatibility decision.

One output, three separate questionsMODEL-SPECIFIC EVIDENCE • CONCEPTUAL EXPLANATIONPERMISSIONDoes the exact manufacturer permitthese two devices on this output?CAPACITYIs complete simultaneous demandwithin the exact output allowance?OPERATIONDo the applicable start and runconditions remain satisfied?A small current sum alone does not answer the permission question.Editorial concept diagram • No measured values • Not an installation approval
A small current sum alone does not answer the permission question. Qualitative concept diagram; scroll sideways on small screens. The same distinctions are explained in the text.

Identify the hardware and every simultaneous load

Before deciding whether an output can serve the proposal, collect the exact controller model and hardware documentation, relay model and coil specification, master-valve solenoid specification and relevant simultaneous station loads. Establish which loads share an output limit and which contribute to the controller’s total available supply.

Use the manufacturer’s stated categories. If a document distinguishes starting and holding demand, retain both. If it states a maximum per output and a separate total, check both. Do not substitute a convenient number measured with devices disconnected for the operating requirement under the proposed load.

A compatibility record that prevents a false approval
Record Required evidence Unresolved result
Controller identity Exact model and applicable hardware instructions An app-family name alone leaves the hardware limit unknown.
P/MV arrangement Explicit permission for the proposed device combination Single-device wording is not evidence that two devices are permitted.
Electrical demand Relevant device and simultaneous-load specifications Matching voltage alone leaves current compatibility unproved.
Installation design Approved wiring, protection, isolation and commissioning plan A successful arithmetic check does not approve an improvised circuit.

The information request should describe what will operate together. A statement that each component works separately is incomplete when both will be energised during the same watering event. Equally, an apparently suitable relay does not establish the rating or behaviour of an unidentified master-valve coil.

Why a current calculation is necessary but insufficient

An overloaded proposal can be rejected from its documented electrical demand. Passing a simple sum is a different proposition: it only shows that the stated numbers did not exceed the particular limit used in that calculation. It does not prove that the controller permits the connection topology or that all relevant operating conditions were included.

This is why a compatibility record needs both a numerical check and a permission check. The designer must know which current figures apply, what can operate simultaneously and whether the proposed arrangement is supported. If any of those inputs is missing, the calculation is incomplete rather than reassuring.

Hunter’s pump-relay chattering guidance identifies insufficient current reaching the relay as a usual cause and distinguishes a new installation from one that previously worked. It also addresses wiring and recommends a licensed electrician where the reader is unfamiliar with electricity. Chattering is therefore a symptom to investigate; it is not proof that the relay alone is defective or permission to bypass the controller.

Document-review flowchart for Can a Master Valve and Pump Relay Share One P/MV Output?; missing identity or evidence leads to a hold
Document-review flowchart. Follow the equivalent decisions explained in the text; this diagram is not an installation approval.
  1. Identify controller and both loads
  2. Confirm exact maker permission; NO or unknown leads to HOLD
  3. Check output and total-load requirements
  4. Missing evidence leads to HOLD or rejection; only complete evidence advances to qualified review

Full-size document-review flowchart
Separate water-side and control-side evidenceMODEL-SPECIFIC EVIDENCE • CONCEPTUAL EXPLANATIONWATER SIDEPipe, fitting and service detailssupport the pipework enquiry.CONTROL SIDEController, valve and relay datasupport the output review.MISSING LINKA pipe photograph establishes noelectrical compatibility permission.Conceptual evidence map — not a wiring diagram.Editorial concept diagram • No measured values • Not an installation approval
Conceptual evidence map — not a wiring diagram. Qualitative concept diagram; scroll sideways on small screens. The same distinctions are explained in the text.

Two completed review decisions

Illustrative proposal A: the relay alone requires more holding current than the exact controller’s documented P/MV limit. The proposal fails that stated comparison before the master-valve coil is added. The decision is to reject the connection as proposed and ask the responsible supplier or installer for a supported redesign. Adding a second load cannot repair the failed limit.

Illustrative proposal B: the supplied holding-current figures add to less than the cited output limit, but the controller manual describes a single master valve or relay. The arithmetic entry may be favourable, yet the two-device permission remains absent. The decision is a hold for explicit model-specific manufacturer confirmation and the remaining operating-load checks. Do not turn “not numerically rejected” into “approved.”

Change proposal B by supplying a maker-approved arrangement for those exact components. That resolves the permission gap only. The installer still needs to confirm its loading, wiring, isolation and commissioning conditions. Approval of another controller or another relay does not resolve this proposal.

Do not confuse two loads with two controllers

There are two different sharing questions: one controller operating a relay and master valve, and two controllers attempting to command one shared device. They can both involve a pump and the same P/MV label, but their electrical interfaces differ. Do not connect outputs or commons by copying a diagram intended for the other arrangement.

Document both controller identities if a shared-water-source installation contains more than one controller. The existence of a shared well or main does not establish that their outputs may be tied together. Any isolated interface or redesign must be approved for the actual devices, rather than inferred from a forum circuit.

Black pipes with blue compression tees in an open trench; no controller or relay visible.
Pipework context from the existing library: buried plastic pipes and compression fittings. This view provides no evidence about controller outputs, relay demand or electrical compatibility.

Keep the water-side enquiry separate

NOVA’s piping product information can support an enquiry about the water-side pipework and connections. Send pipe material, dimensions, service conditions and connection requirements for that enquiry. Controller loading and pump electrical approval remain questions for the responsible equipment manufacturers and installer; this article does not establish a NOVA controller, relay or commissioning service.

Two illustrative P/MV review outcomes
Proposal Finding Disposition
Relay alone exceeds the exact output limit Known incompatible demand Reject the proposal
Combined holding current below the cited limit, but no permission for two devices Permission and remaining operating checks are missing Hold for the exact manufacturer’s confirmation

Conclusion

A shared P/MV label is not a two-device approval. Establish the exact hardware, documented simultaneous demand and explicit permitted arrangement. Reject a known overload; retain a hold when permission or operating data is missing. Keep the controller command separate from pump power and have any physical electrical changes designed and executed competently.

Frequently asked questions

Can two 24 VAC devices share any P/MV output?

No general permission follows from matching voltage. Check the exact output, total load requirements and manufacturer-approved arrangement.

Is adding the holding-current figures enough?

No. Use all relevant manufacturer load categories and obtain permission for the proposed combination; a favourable sum alone is incomplete.

Does a chattering relay prove the relay is faulty?

No. The control supply and installation can also be involved. Have the actual equipment and wiring investigated using its documentation.

Can the controller power the pump directly?

Do not connect a pump motor to the P/MV control output. Follow the manufacturers’ approved relay and electrical installation requirements.

Written by Justin.